Total Listed Capacity
4,863.5MW
Across catalogued South India records.Dataset Aggregate PUE
1.22Ratio
Capacity-weighted aggregate (Mean: 1.23)Listed Clean-Energy Share
98%
Capacity-weighted value from listed records.Catalogued Infrastructure Records.
12Nodes
5 Southern states covered| Hub & State | Cooling Architecture | Freshness | Audit Details | |||||
|---|---|---|---|---|---|---|---|---|
Pavagada Mega Solar Transmission Complex | BLRKarnataka | 2,050.0 | N/A (Grid) | 100% | 42 | Central Inverter Forced Air | Verified Q3 2026 | |
Ananthapuramu Ultra Mega Solar Substation | BLRAndhra Pradesh | 1,500.0 | N/A (Grid) | 100% | 44 | Dry Air Convection | Verified Q3 2026 | |
Kamuthi Clean Energy Generation Substation | MDUTamil Nadu | 648.0 | N/A (Grid) | 100% | 45 | Ambient Solar Inverter Liquid | Verified Q3 2026 | |
Kayathar High-Density Wind Transmission Corridor | MDUTamil Nadu | 380.0 | N/A (Grid) | 100% | 38 | Passive Nacelle Radiative | Verified Q3 2026 | |
Chennai Ambattur Hyper-Density Exchange | MAATamil Nadu | 75.0 | 1.21 | 58% | 510 | Rear-Door Heat Exchanger Hybrid | Verified Q3 2026 | |
Hyderabad Genome Valley Compute Complex | HYDTelangana | 60.0 | 1.19 | 70% | 455 | Direct-to-Chip Liquid | Verified Q3 2026 | |
Bangalore South AI Acceleration Hub | BLRKarnataka | 45.0 | 1.18 | 65% | 470 | Direct-to-Chip Liquid (100 kW/rack) | Verified Q3 2026 | |
Coimbatore Western Gateway Facility | CJBTamil Nadu | 32.0 | 1.24 | 82% | 365 | Closed-Loop Chilled Water | Verified Q3 2026 | |
Mangalore Coastal Landing Gateway | IXEKarnataka | 25.0 | 1.22 | 88% | 330 | Seawater Heat Exchange / Closed-Loop | Verified Q3 2026 | |
Madurai Edge Compute & Transit Exchange | MDUTamil Nadu | 18.5 | 1.28 | 74% | 412 | Air / Liquid Hybrid | Verified Q3 2026 | |
Kochi Marine Gateway & Subsea Landing | COKKerala | 16.0 | 1.25 | 92% | 215 | Closed-Loop Hydrothermal | Verified Q3 2026 | |
Trichy Central Transit Distribution Hub | TRZTamil Nadu | 14.0 | 1.31 | 68% | 440 | Evaporative Eco-Cooling | Audit Pending |