
Infrastructure Relevance
The reference describes a proposed 90+ acre / 65-acre industrial portfolio with scalable site power, a dedicated 230/110 kV connection, and industrial water planning. These are source-reported planning claims rather than verified GreenNext assets. Any future facility would need independent confirmation of land title, dual-feed design, utility approvals, water continuity, and the distinction between site power and data-centre IT load.
Regional Infrastructure Planning
ProposedThis regional profile supports feasibility and infrastructure planning. Facility operation, land control, utility capacity, customer deployment, and final technical specifications remain project-specific.
Site, Power, Cooling & Connectivity
Portfolio fields are shown separately by domain. Source-reported and proposed figures are planning references, not independent verification.
90+ acres; 65 acres
Conflicting source-reported figures; do not treat either as verified.
Unavailable for this region
120 MW scalable
Site/portfolio power claim; not equivalent to data-centre IT load.
80+ MW hyperscale compute parcel
Reference claim only; not confirmed IT load or secured capacity.
230/110 kV dedicated hookup
Connection, redundancy, and approval status require confirmation.
100% green open-access power described in reference
2.5 MLD
Allocation and continuity require utility confirmation.
Unavailable for this region
Unavailable for this region
Carrier-neutral fibre loop with six Tier-1 backbones; NH-44, Electronic City proximity and rail-freight connectivity described
60 minutes to Bengaluru International Airport; 35 km from Electronic City
Industrial / IT-SEZ suitability described
Technology & Engineering Ecosystem
Hosur's planning relevance comes from its automotive, EV, battery, robotics, drone, avionics, and precision-electronics ecosystem, together with access to the Bengaluru technology and engineering talent market. The proposed regional role is therefore industrial edge and AI infrastructure supporting manufacturing operations, with hyperscale-edge feasibility treated as a future development question.
Connectivity & Logistics Assets
Regional Focus & Next Steps
GreenNext's focus in Hosur is to assess EV and robotics workloads, AI edge architectures, high-density GPU requirements, industrial power and water feasibility, and the connectivity needed for resilient enterprise and manufacturing operations.