Illustrative Planning ToolConceptual Specification

Estimate workload energy impact

Adjust a few workload assumptions to understand the directional relationship between compute, operating time, energy, and cooling demand.

KPI 9 — Energy Consumption & Operating Cost Model

Workload Energy & Cost Estimator

Calculate baseline IT electricity consumption, facility cooling overhead via PUE, and projected utility operating expenditure under customizable industrial tariffs.

Directional Model
8 units
12 hrs/day
22 days/mo
1.25 PUE
₹/ kWh
Illustrative regional planning assumption (not a GreenNext tariff or power sales quote). Currency toggle selects independent reference assumptions and does not perform live FX conversion.
Projected Consumption & OPEX

AI Training Profile Output

700 W/unit assumption
IT Compute Energy1,478.4 kWh
Cooling & Overhead369.6 kWh
Total Facility Power1,848 kWh
Est. Monthly Electricity Cost
₹15,708
Based on 22 operating days (1848 kWh @ ₹8.5/kWh)
Est. Annualized Facility OPEX
₹188,496
12-month run rate with static workload assumption
Analytical DashboardWhat-If Simulation

PUE Sensitivity & Annual Operational Energy Impact

Evaluate annual kWh draw and operational expenditure variations across thermal efficiency envelopes.

Selected PUE1.25
Optimal Delta-₹30k/yr
Illustrative modeling envelope based on user parameters.PUE = Total Facility Energy / IT Equipment Energy

Formulas: IT Energy (kWh) = (Units × Assumed Watts × Hours × Days) ÷ 1,000
Facility Energy (kWh) = IT Energy × PUE (1.25)
Cost = Facility Energy × Electricity Tariff (₹8.5/kWh)

Billing Exclusions: This estimate computes raw active electrical energy consumption. It excludes contractual maximum demand (kVA) charges, power factor penalties, Time-of-Day (TOD) peak tariffs, open-access transmission wheeling surcharges, and state electricity duties. Not an actual utility bill.